The large number of nodes and their indefinite relationship result in the complicated drawing course of double code network diagram 摘要在雙代號(hào)網(wǎng)絡(luò)圖的繪制過(guò)程中,由于節(jié)點(diǎn)的數(shù)量較多并且節(jié)點(diǎn)之間的相互關(guān)系不明確,從而導(dǎo)致繪圖過(guò)程比較困難和復(fù)雜。
Although older clients can be configured to connect to a named instance , each client requires a " server name " definition and a hard - coded network address for the named instance 盡管更舊版本的客戶端可以配置為連接到命名實(shí)例,但每個(gè)客戶端都需要該命名實(shí)例的“服務(wù)器名”定義和硬編碼網(wǎng)絡(luò)地址。
Base on the principles of system analysis , a generalized optimization method of engineering projects control system is given which carries out the idea of dynamic optimization management . this paper put forward a comprehensive optimum method that consider three indexes such as time limit for a project , cost and resources , and use two - code network plan to achieve a series of solutions . base on the principles of system analysis and correlation , this paper presents a coordination degree model in the decision process , which aims to evaluate and obtain the optimum solution 本論文從系統(tǒng)協(xié)調(diào)的角度出發(fā),探討貫穿工程項(xiàng)目始終的綜合動(dòng)態(tài)控制,利用網(wǎng)絡(luò)計(jì)劃技術(shù)對(duì)工期、費(fèi)用、資源作整體的優(yōu)化,得一系列方案,根據(jù)系統(tǒng)協(xié)調(diào)的原理,建立工程項(xiàng)目控制系統(tǒng)的系統(tǒng)協(xié)調(diào)度模型,并設(shè)計(jì)符合本系統(tǒng)特點(diǎn)的協(xié)調(diào)度判定指標(biāo)體系,用協(xié)調(diào)度指標(biāo)來(lái)反映其協(xié)調(diào)統(tǒng)一程度,用來(lái)對(duì)優(yōu)化方案進(jìn)行評(píng)價(jià)和優(yōu)選。